K029
K29/58, K29/54: Archaeological Authority Monitoring Report 2019/604, Denniston Stonewalls Stabilisation: Brakehead (K29/58) & Conns Creek Siding (K29/54) (2024)
K29/8: Test Pits at the Buller Mouth Site (K29/8 - NZHPT Authority 2004/1) (2004)
K29/80: Bridge 127, Stillwater, Ngakawa Line: Report on Archaeological Monitoring (2013)
K29/77: Report on the Archaeological Recording at Lake Rochfort, West Coast (2011)
K29/58: Archaeological Authority Monitoring Report 2019/604, Denniston Stonewalls Stabilisation: Donkey Winch 2 Section (K29/58) (2023)
K29/8: Final Report on Exacavations at the Kawatiri Site (K29/8), West Coast, under NZHPT Authority (2004/172) (2011)
K29/61: HPT Authority 2007/236 Section 17 Report: Banbury Arch, Denniston (2007)
K29/81: Bridge 126, Stillwater Ngakawau Line (K29/81): Report on Archaeological Monitoring (2014)
K29/1, K29/50: Cape Foulwind - Tauranga Bay Carpark Upgrade 2006/135 (2006)
K29/58: Denniston Stone Wall Stabilisation Report: Donkey Winch Wall: addendum report prepared for Historic Places Trust (2015)
K29/100: Buller River Wharf, Westport, A Final Report for Archaeological Investigations at Site No. K29/100 under Archaeological Authority No. 2023/414EM6 (2024)
K29/71: Bridge 130, Whareatea River, Westport: A Report on Archaeological Monitoring of its Demolition (2008)
K29/58: Denniston Stone Wall Stabilisation Report (2009)
K29/58: HPT Authority 2007/235 Section 17 Report: Denniston Incline Brake-head (2007)
K29/32: Nigel Philpott - Christmas Terrace Subdivision, Archaeological Evaluations and Assessment of Effects (2007)
K29/8: Excavations at the Buller Site, Jan 28th - Feb 11th 2004 (2004)